Sections
MW-02Progress Period : 2022-03-01 To 2022-03-31
- Main Access Tunnel Excavation & Support (#1): completed
- Main Access Tunnel Excavation & Support (#2):14.3 %
- Surge Chamber Vault Access Tunnel: 97.7 %
- Service Tunnel A: 99.5 %
- Service Tunnel C: completed
- Underground Powerhouse Excavation & Support: 8.6 %
- Underground Transformer Cavern Excavation & Support: 8.5 %
- Drain Tunnel: 94.5 %
- GIS Room Access Tunnel: 98.9 %
- Penstock Adit Tunnel No.01: 95.4 %
- Penstock Adit Tunnel No.02: Completed
MW-01Progress Period : 2022-03-31 To 2022-03-31
Concrete Work Diversion Tunnels
Diversion Tunnel A
- Inlet Structure 38 % completed.
- Inlet Tunnel Linning 44 % completed.
- Outlet Structure 24% completed.
- Invert Levelling Concrete L/S 30% and R/S 26 % completed.
Diversion Tunnel B
- Inlet Structure 53 % completed.
- -Inlet Tunnel Linning 44 % completed.
- -Outlet Structure 18% completed.
- -Invert Levelling Concrete L/S 49% and R/S 66 % completed.
- -Shear Zone Area 21% completed.
Left Bank Traffic Diversion Tunnel
- -Underground Excavation Work 22% completed.
DASU KKH-01 : Relocation of Karakoram Highway Progress Period : 2022-03-01 To 2022-03-31
Contract | Elapsed Time | Actual Progress Prior to this month | Work Progress During this Month | Total Progress (up to march 2022) |
DASU KKH-01 | Month (79.3) 153.4% | 31.3% | 0.17% | 31.47% |
The major activities undertaken during this month were:
- After completion of excavation works for Uchar Nullah access road, Logro B tunnel outlet (Dasu direction) axillary works continued during the month.
- Portal construction of K3 tunnel, back filling above outlet portal and Shotcrete at Inlet Portal continued during the month.
- Excavation works at Zero point first and third benches continued during the month.
- Breast wall construction works at K8 continued during the month under review.
- Construction of retaining walls at K5, K6 and K7 continued during the month.
RAR-01 and RAR-02 ProgressProgress Period : 2022-03-01 To 2022-03-31
Progress on RAR-01 in the month of March-2022
Package |
Elapsed time |
Actual Work Progress Prior to this Month (%) |
Work Progress of this Month |
Work Progress up to this month |
|||
Month |
% |
Scheduled % |
Actual % |
Scheduled % |
Actual % |
||
ICB No. DASU-RAR-01 |
79.3 |
134.9 |
96.2 |
- |
0.25 |
100 |
96.5 |
Major Activities of RAR-01
The major activities undertaken during this month were:
Construction Activities
- · Side drain vertical portion concrete is in progress.
- · Concrete edge protection barrier around K11+400 in completed.
- · Concrete barrier at Siglo culvert right & left side in completed.
- · Blasting & excavation work at local access at K11+600 in progress
- · Fixing formwork for side drain around K11+200 and concrete for side drain wall.
- · Fixing of wire mesh on edge barriers around K11+400 & completed.
- · Concrete for side drain around K9+300 to K9+400 in progress and completed.
- · Drilling for blasting around 0+250 in work progress at Komila bypass.
- · Excavation work in progress around 0+750 at komila bypass.
- · Excavation work in progress 0+950 at komila bypass.
Progress on RAR-02 in the month of March-2022
The progress of RAR-02 during this month is summarized in the following Table:
Package |
Elapsed time |
Actual Work Progress Prior to this Month (%) |
Work Progress of this Month |
Work Progress up to this month |
|||
Month |
% |
Scheduled % |
Actual % |
Scheduled % |
Actual % |
||
ICB No. DASU-RAR-02 |
10.4 |
43.4 |
0.8 |
4.40 |
0.15 |
33.7 |
0.9 |
The Contract has been commenced on 20th May 2021.
The progress of RAR-02 during this month is summarized in the following Table:
Major Activities of RAR-02
The major construction activities undertaken during this month were:
- · Blasting and mucking work for open excavation from K12+660 to K13+145 were conducted continuously.
- · The Contractor has planned to mobilize to the Contractor's camp in Kaigah and he requested the Employer to arrange security. The Employer is processing the security arrangements, accordingly.
- · The Contractor plan to start new work face in Kandia River, after the mobilization to the Kaigah camp.
Tl-01Progress Period : 2022-04-08 To 2022-05-08
Grid Station:
- Control house building: Concrete of columns and trenchers, removal of Scaffolding/formwork from switch gear trench & columns.
- Shifting of excavated material from terrace 1 to Dumping Area.
- Shifting of back fill material from Alignment #1 to grid station.
- Access Road: excavation on alignment #2.
AREA WISE PROGRESS OF TRANSMISSION LINE:
Area |
Total Towers |
Excavation |
Slide Removal |
Foundation Concrete Completed |
Concrete Backfilling Completed |
Soil Backfilling Completed |
Tower Erection Completed |
Stringing spans Completed |
RoW |
Comments |
|
In Progress |
Completed |
||||||||||
Palas |
10 |
0 |
10 |
- |
10 |
10 |
10 |
10 |
03 |
|
|
Pattan |
98 |
0 |
90 |
- |
87 |
60 |
82 |
84 |
13 |
08 |
Commencement of JKD towers still awaited. |
Shek Band |
23 |
0 |
23 |
- |
23 |
23 |
23 |
23 |
17 |
0 |
|
Jalkot |
20 |
0 |
20 |
- |
20 |
07 |
20 |
20 |
15 |
0 |
|
TeyalMaidan |
28 |
0 |
28 |
- |
28 |
22 |
27 |
16 |
09 |
06 |
|
Total |
179 |
0 |
170 |
0 |
168 |
122 |
162 |
151 |
57 |
14 |
|